For the first time, the regulations set maximum working temperatures for all employees. The employer adapts work to the temperature. SMAT measures every zone every 5 minutes, signals when a threshold is exceeded and keeps the evidence.
Two kinds of work under § 30a: in a warehouse and in an open space. Each day in two versions that differ only in when the site learns about the temperature and when it starts to react.
The Regulation of the Minister of Family, Labour and Social Policy of 9 July 2026 adds § 30a to the Polish general OHS regulations. Move the slider or choose the type of workplace to see what follows from the temperature.
The law does not require a measurement system. It expects a response to the thresholds. To respond in time, it helps to know the temperature in every work zone.
SMAT monitors temperature in halls, warehouses and yards. A sensor in the work zone sends a reading every 5 minutes. A gateway forwards it to the server — on your premises or ours, your choice. The server compares the temperature with the zone threshold and triggers signalling.
Downtime can often be avoided if the site learns about the risk early enough. SMAT analyses the temperature trend in every zone and notifies at two levels.
The employer adapts work to the temperature throughout the season, on every shift, in every zone. Felixcom recommends automatic measurement for three reasons.
The record of readings, alarms and settings changes cannot be modified. Humidity is recorded from the start, with future indicators combining temperature and humidity in mind.
Measurement is only the start. What counts is what happens next.
The regulation does not say what to measure temperature with. A thermometer, a sensor kit and SMAT give the same number in °C. They differ in whether the measurement knows the zone threshold, whether it tells weather-related heat from process heat, who learns about an exceedance and what remains for a PIP inspection.
| criterion | Thermometer and manual recordsmanual_log | Sensor kit with SMS alarmssensor_kit | SMATzone_rules · audit_log |
|---|---|---|---|
| Measurement on every shiftcoverage_24_7 | When someone measures and records the result. | Automatically, every few minutes. | Every 5 minutes. Two sensors per zone and a missing-data alarm. |
| § 30a thresholdszone_profile | The worker compares the result with a table and judges the type of work themselves. | Alarm threshold set on the sensor. | Zone profile: action and stop-work thresholds, physical work, exemptions assessed by OHS. |
| Short temperature spikesavg · hysteresis | The result depends on the moment of reading. | Usually an alarm from a single reading. | Averaging and hysteresis approved by OHS. No alarms every few minutes at the edge of the threshold. |
| Weather-related heat or process heatref_outdoor | No reference. | Only if someone plans an outdoor sensor. | An outdoor reference sensor in every deployment. Its record sits in the register next to the zone reading. |
| Work in open spacesmobile_sensor | Manual measurement at the workstation. | Fixed sensors, mostly indoors. | Mobile sensors in a radiation shield, moved along with the work front. The register records where they stood. |
| Warning before the thresholdearly_warning | None. | An additional, lower alarm threshold. | Trend analysis: estimated time to the threshold and advance notification. |
| Who learns about an exceedancenotify | The person who took the measurement. | Designated people, by text message and email. | OHS and the shift manager by text message and email. The crew through the zone board and voice announcements in the crew's languages. |
| Reading at the workplacelocal_display | Only at the thermometer. | Depends on the sensor. Some have a temperature display. | A sensor with a display in the zone shows the temperature. The zone board shows the decision: normal, apply measures, stop work. |
| Evidence for a PIP inspectionaudit_log | A notebook or spreadsheet. Entries can be corrected. | Reading history and a report. | A record that cannot be altered: readings, alarms, acknowledgements and threshold changes. Reports in PDF and CSV. |
| Where the data isdata_location | In a notebook or spreadsheet. | Usually in the supplier's cloud. | On a server on your site or on a Felixcom server, your choice. |
| Scale and rolloutrollout | A few measurement points. | A ready-made kit for one hall. | Up to hundreds of measurement points: coverage pilot, layout design, installation, acceptance and training. |
A comparison of typical solutions, not specific products. Features of individual kits may differ.
Start in winter. By May the system should be running.
The regulation takes effect in January, but the first heatwave will put it to the test. Winter leaves time for a coverage pilot, installation and arrangements with OHS without temperature pressure.
We will answer questions about your specific site during the review.
From 11 January 2027. It is introduced by § 30a of the Polish general OHS regulations, added by the Regulation of the Minister of Family, Labour and Social Policy of 9 July 2026 (Journal of Laws 2026, item 927).
35 °C in indoor workplaces and 32 °C for physical work in open spaces. Once the threshold is exceeded due to weather conditions, work is stopped for as long as it remains exceeded.
Apply technical or organisational measures. For physical work indoors the threshold is 25 °C. In open spaces, organisational measures apply above 25 °C.
No. The regulations require a response to the temperature thresholds and do not specify how to measure. Felixcom recommends automatic measurement because it does not depend on people remembering, provides documentation for OHS and PIP inspections, and allows automatic signalling.
The regulation does not rule it out. A thermometer is enough if someone measures the temperature in the right place, in every zone and on every shift, records the result and immediately notifies the people who decide about work. On a large site, with shift work and outdoor work, that is hard to ensure without automatic measurement.
Since 8 July 2026 the fine under Art. 283 § 1 of the Polish Labour Code is PLN 2,000 to 60,000. A PIP inspector can issue an on-the-spot fine of up to PLN 10,000.
Yes. For work in open spaces we can deploy mobile sensors placed at the work location, e.g. by an excavation, on a construction site or at a loading dock. The sensor stands on a tripod or post in a radiation shield at work-zone height, runs on a battery and moves along with the work front. Data travels over LoRaWAN to the site gateways, and further from the site through a mobile gateway with a cellular (LTE) link. The sensor measures the air temperature inside the shield, i.e. the value in °C that the § 30a thresholds refer to.
The § 30a thresholds apply to temperature raised due to weather conditions. SMAT has reference sensors outside the building. Their record shows whether an exceedance in a zone is caused by the weather.
The exceedance rule — how readings are averaged and the hysteresis — is approved by your site's OHS team. SMAT applies it the same way in every zone and records every change of settings.
No. The employer is responsible for applying § 30a. SMAT measures the temperature, warns ahead of the thresholds, sends notifications and documents the site's response. Measures, exemptions and measurement points are set by the site's OHS team.
No. Some work is exempt from the limit, including rescue operations, continuous operations and transport. We recommend that the site's OHS team assess which work is exempt, define the zones and choose the measurement points.
No. The sensors are wireless, use the open LoRaWAN standard (EU868) and run for years on a replaceable battery. A PoE network cable is needed only for the gateways.
A sensor kit measures and sends an alarm when a set threshold is exceeded. SMAT applies the § 30a thresholds according to the zone profile, averages readings with hysteresis, compares the zone with an outdoor reference sensor, supports mobile sensors, warns in advance, also notifies the crew in the zone and keeps a record that cannot be altered. Data can stay on a server on your site. See the comparison.
The cost depends on the number of zones and the size of the site. We prepare a quote after a site review. Send an enquiry using the form on this page.
We will walk through your halls and yards with you, define the work zones and measurement points, check the LAN and decide where the server should run. You will receive the SMAT rollout scope for your site.
We reply within one business day. Fields marked with an asterisk are required.